Supervision of the construction of an ASU gas separation facility

Project Description

Addition of analytical and laboratory capabilities in the separation plant to supply clean hydrogen for the wafer production process.

Client:

Air Products

Location:

Large Semiconductor FAB – Kiryat Gat

Project Duration:

Approximately 7 months

Challenges:

Work was carried out without interrupting the existing separation facility, completed with no incidents and full client satisfaction.

Our Solutions:

Installation of a very advanced instrumentation and control system designed for gas compression processes.

Client:

Air Products

End Client:

Large Semiconductor FAB – Kiryat Gat

System:

system

Location:

location

Project Duration:

Work was carried out without interrupting the existing separation facility, completed with no incidents and full client satisfaction.

Challenges:

Work was carried out without interrupting the existing separation facility, completed with no incidents and full client satisfaction.

Our Solutions:

Installation of a very advanced instrumentation and control system designed for gas compression processes.