Chemical filtration systems

Project Description

Design, construction and supply of precise chemical systems according to the customer’s needs. The project included characterization, detailed design and implementation of chemical dosing systems for a large wastewater neutralization facility. While adhering to specific requirements such as suitable structural materials, resistance to flammable environments, etc.

Client:

MWHSB

EndClient:

Large Semiconductor FAB

Syetem:

Wastewater Treatment Facility

Location:

Kiryat Gat

Project Duration:

Approximately 12 months

Challenges:

Use of hazardous materials required client supervision and approval at every stage.

Our Solutions:

A precise and managed engineering process from concept design through client approval to execution.

Client:

MWHSB

End Client:

Kiryat Gat

System:

system

Location:

location

Project Duration:

Use of hazardous materials required client supervision and approval at every stage.

Challenges:

Use of hazardous materials required client supervision and approval at every stage.

Our Solutions:

A precise and managed engineering process from concept design through client approval to execution.